{"title":"Installations","description":null,"products":[{"product_id":"x700","title":"Countertop Plug In Water Boiler Installation","description":"\u003cp\u003eInstallation for water connection for a 13 Amp plugged water boiler.\u003cbr\u003e\nProfessional installation by a qualified service provider for a 13 Amp plugged water boiler. Installation includes siting of the product and plumbing in to existing services, as well as testing once installed. All work is guaranteed for 7 days following the installation.\u003cbr\u003e\nThis installation requires a 13 Amp plug socket within 1 metre of proposed siting of water boiler\u003cbr\u003e\nA plumbed water source also needs to be available, with a standard isolated washing machine type connection within 1 metre of proposed siting of water boiler\u003cbr\u003e\nThe services for any countertop boilers must be easily accessible. The installation does not include cutting through any work surfaces to run services from beneath\u003cbr\u003e\nPlease check the site has the correct requirements for this installation (e.g. suitable power connections). If unsure, a site survey is recommended prior to installation - please call for further information\u003cbr\u003e\nYou can check the Specification tab for more details.\u003c\/p\u003e","brand":"Non Branded","offers":[{"title":"Default Title","offer_id":56803747529091,"sku":"X700","price":220.17,"currency_code":"GBP","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0570\/9375\/0941\/files\/x700_logoicon_9e6e2154-2b55-4e6a-9903-6eaabf2ad4ea.jpg?v=1762544087"},{"product_id":"x701","title":"Wall Mounted Plug In Water Boiler Installation","description":"\u003cp\u003eInstallation for a wall mounted water connection for a 13 Amp plugged water boiler.\u003cbr\u003e\nProfessional installation by a qualified service provider for a 13 Amp wall mounted plugged water boiler. Installation includes siting of the product, mounting product to suitable wall and plumbing in to existing services, as well as testing once installed. All work is guaranteed for 7 days following the installation.\u003cbr\u003e\nThis installation offer requires a 13 Amp plug socket within 1 metre of proposed siting of water boiler, as well as a suitable wall area for unit to be mounted to\u003cbr\u003e\nA plumbed water source also needs to be available, with a standard isolated washing machine type connection within 1 metre of proposed siting of water boiler\u003cbr\u003e\nThe services for any wall mounted water boilers must be easily accessible. The installation does not include cutting through any work surfaces to run services from beneath\u003cbr\u003e\nPlease check the site has the correct requirements for this installation (e.g. suitable power connections). If unsure, a site survey is recommended prior to installation - please call for further information\u003cbr\u003e\nYou can check the Specification tab for more details.\u003c\/p\u003e","brand":"Non Branded","offers":[{"title":"Default Title","offer_id":56803747561859,"sku":"X701","price":252.87,"currency_code":"GBP","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0570\/9375\/0941\/files\/x700_logoicon_3bea82b9-ce2d-43fc-8e27-60e30d324e03.jpg?v=1762544088"},{"product_id":"x702","title":"Countertop Hardwired Water Boiler Installation","description":"\u003cp\u003eInstallation for a countertop water connection for a water boiler with such power that it requires hard wiring (e.g. single phase 16amp).\u003cbr\u003e\nProfessional installation by a qualified service provider for a hardwired countertop water boiler. Installation includes siting of the product, connection to existing electrical supply and plumbing in to existing services, as well as testing once installed. All work is guaranteed for 7 days following the installation.\u003cbr\u003e\nThis installation requires power source with a industry approved electrical isolator socket or junction box within 1 metre of proposed siting of water boiler\u003cbr\u003e\nA plumbed water source also needs to be available, with a standard isolated washing machine type connection within 1 metre of proposed siting of water boiler\u003cbr\u003e\nThe services for any countertop boilers must be easily accessible. The installation does not include cutting through any work surfaces to run services from beneath\u003cbr\u003e\nPlease check the site has the correct requirements for this installation (e.g. suitable power connections). If unsure, a site survey is recommended prior to installation - please call for further information\u003cbr\u003e\nYou can check the Specification tab for more details.\u003c\/p\u003e","brand":"Non Branded","offers":[{"title":"Default Title","offer_id":56803747594627,"sku":"X702","price":236.52,"currency_code":"GBP","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0570\/9375\/0941\/files\/x700_logoicon_1ef3d095-ad39-497a-b3d8-33c52e507f36.jpg?v=1762544090"},{"product_id":"x703","title":"Wall Mounted Hardwired Water Boiler Installation","description":"\u003cp\u003eInstallation for a wall mounted water connection for a water boiler with such power that it requires hard wiring (e.g. single phase 16amp).\u003cbr\u003e\nProfessional installation by a qualified service provider for a hardwired wall mounted water boiler. Installation includes siting of the product, mounting product to suitable wall, connection to existing electrical supply and plumbing in to existing services, as well as testing once installed. All work is guaranteed for 7 days following the installation.\u003cbr\u003e\nThis installation requires power source with a industry approved electrical isolator socket or junction box within 1 metre of proposed siting of water boiler\u003cbr\u003e\nA plumbed water source also needs to be available, with a standard isolated washing machine type connection within 1 metre of proposed siting of water boiler\u003cbr\u003e\nThe services for any wall mounted water boilers must be easily accessible. The installation does not include cutting through any work surfaces to run services from beneath\u003cbr\u003e\nPlease check the site has the correct requirements for this installation (e.g. suitable power connections). If unsure, a site survey is recommended prior to installation - please call for further information\u003cbr\u003e\nYou can check the Specification tab for more details.\u003c\/p\u003e","brand":"Non Branded","offers":[{"title":"Default Title","offer_id":56803747627395,"sku":"X703","price":263.77,"currency_code":"GBP","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0570\/9375\/0941\/files\/x700_logoicon_d7b10a8f-574f-40de-b93e-6abaacc4e6e4.jpg?v=1762544093"},{"product_id":"x704","title":"Under Counter Water Boiler Installation","description":"\u003cp\u003eInstallation for an under counter water connection for a 13 Amp plugged water boiler.\u003cbr\u003e\nProfessional installation by a qualified service provider for an undercounter 13 Amp plugged water boiler. Installation includes siting of the product and plumbing in to existing services, as well as testing once installed. All work is guaranteed for 7 days following the installation.\u003cbr\u003e\nThis installation requires a 13 Amp plug socket within 1 metre of proposed siting of the water boiler. Access through the worktop into the under counter siting of the boiler is also required\u003cbr\u003e\nPlease check the site has the correct requirements for this installation (e.g. suitable power connections). If unsure, a site survey is recommended prior to installation - please call for further information\u003cbr\u003e\nDue to the wide variety of materials used for counters, it is recommended that any access holes are pre-cut before installation is arranged\u003cbr\u003e\nA plumbed water source also needs to be available, with a standard isolated washing machine type connection within 1 metre of proposed siting of water boiler\u003cbr\u003e\nThe services for any under counter boilers must be easily accessible\u003cbr\u003e\nYou can check the Specification tab for more details.\u003c\/p\u003e","brand":"Non Branded","offers":[{"title":"Default Title","offer_id":56803747660163,"sku":"X704","price":263.77,"currency_code":"GBP","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0570\/9375\/0941\/files\/x700_logoicon_71aa675b-3d3b-4c8a-869f-eb564864d904.jpg?v=1762544095"},{"product_id":"x705","title":"Disconnection and Removal of Water Boiler","description":"\u003cp\u003eUninstallation of existing water boiler from site. Disconnection of power supply and water services.\u003cbr\u003e\nProfessional uninstallation and removal of an existing water boiler. Disconnection of power and water connections.\u003cbr\u003e\nYou can check the Specification tab for more details.\u003c\/p\u003e","brand":"Non Branded","offers":[{"title":"Default Title","offer_id":56803747692931,"sku":"X705","price":110.08,"currency_code":"GBP","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0570\/9375\/0941\/files\/x700_logoicon_edbc0d28-7de8-4ba3-9943-09e2f810f5fb.jpg?v=1762544097"},{"product_id":"x706","title":"Hardwired High Speed Oven Installation","description":"\u003cp\u003eInstallation, commissioning and testing of a hardwired high speed oven.\u003cbr\u003e\nProfessional installation by a qualified service provider for a hardwired high speed oven. Installation includes siting of the product and wiring to existing services, as well as testing once installed. All work is guaranteed for 7 days following the installation.\u003cbr\u003e\nStandard approved isolator switch, junction box or commando socket protected by a suitably rated circuit breaker (dictated by oven kW rating in appliance specifications) will be required above the counter surface and within 1 metre of the proposed siting\u003cbr\u003e\nAll installation work carries a warranty period of 7 days (warranty period could differ in exceptional circumstances)\u003cbr\u003e\nIncludes labour to install, commission and test for up to 1 hour\u003cbr\u003e\nServices must be easily accessible. The installation does not include cutting through any work surfaces\/walls to run services through\u003cbr\u003e\nPlease check the site has the correct requirements for this installation (e.g. suitable power connections). If unsure, a site survey is recommended prior to installation - please call for further information\u003cbr\u003e\nYou can check the Specification tab for more details.\u003c\/p\u003e","brand":"Non Branded","offers":[{"title":"Default Title","offer_id":56803747725699,"sku":"X706","price":297.56,"currency_code":"GBP","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0570\/9375\/0941\/files\/x700_logoicon_a2a99f81-0042-4ad9-8f21-2ff80b0c2161.jpg?v=1762544100"},{"product_id":"x707","title":"Hardwired Microwave Oven Installation","description":"\u003cp\u003eInstallation, commissioning and testing of a hardwired microwave oven.\u003cbr\u003e\nProfessional installation by a qualified service provider for a hardwired microwave oven. Installation includes siting of the product and wiring to existing services, as well as testing once installed. All work is guaranteed for 7 days following the installation.\u003cbr\u003e\nStandard approved isolator switch, junction box or commando socket protected by a suitably rated circuit breaker (dictated by oven kW rating in appliance specifications) will be required above the counter surface and within 1 metre of the proposed siting\u003cbr\u003e\nAll installation work carries a warranty period of 7 days (warranty period could differ in exceptional circumstances)\u003cbr\u003e\nIncludes labour to install, commission and test for up to 1 hour\u003cbr\u003e\nServices must be easily accessible. The installation does not include cutting through any work surfaces\/walls to run services through\u003cbr\u003e\nPlease check the site has the correct requirements for this installation (e.g. suitable power connections). If unsure, a site survey is recommended prior to installation - please call for further information\u003cbr\u003e\nYou can check the Specification tab for more details.\u003c\/p\u003e","brand":"Non Branded","offers":[{"title":"Default Title","offer_id":56803747758467,"sku":"X707","price":263.77,"currency_code":"GBP","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0570\/9375\/0941\/files\/x700_logoicon_baa082b2-2d70-49f3-a2bb-c28037905031.jpg?v=1762544102"},{"product_id":"x708","title":"Hardwired Countertop Fryer Installation","description":"Installation, commissioning and testing of a hardwired countertop fryer.\nProfessional installation by a qualified service provider for a hardwired countertop fryer. Installation includes siting of the product and wiring to existing services, as well as testing once installed. All work is guaranteed for 7 days following the installation.\u003cbr\u003e\u003cbr\u003ePlease note: this is for countertop fryers only. If you have a freestanding fryer to install please call.\nStandard approved isolator switch, junction box or commando socket protected by a suitably rated circuit breaker (dictated by fryer kW rating in appliance specifications) will be required above the counter surface and within 1 metre of the proposed siting\nAll installation work carries a warranty period of 7 days (warranty period could differ in exceptional circumstances)\nIncludes labour to install, commission and test for up to 1.5 hours\nServices must be easily accessible. The installation does not include cutting through any work surfaces\/walls to run services through\nPlease check the site has the correct requirements for this installation (e.g. suitable power connections). If unsure, a site survey is recommended prior to installation - please call for further information\nYou can check the Specification tab for more details.","brand":"Non Branded","offers":[{"title":"Default Title","offer_id":56803747791235,"sku":"X708","price":297.56,"currency_code":"GBP","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0570\/9375\/0941\/files\/x700_logoicon_f6da229c-cc5b-4f11-8aa2-053b8257d7cd.jpg?v=1762544104"},{"product_id":"x709","title":"Hardwired Salamander Grill Installation","description":"\u003cp\u003eInstallation, commissioning and testing of a hardwired salamander grill.\u003cbr\u003e\nProfessional installation by a qualified service provider for a commercial hardwired salamander grill. Installation includes siting of the product and wiring to existing services, as well as testing once installed. All work is guaranteed for 7 days following the installation.\u003cbr\u003e\nStandard approved isolator switch, junction box or commando socket protected by a suitably rated circuit breaker (dictated by kW rating in appliance specifications) will be required above the counter surface and within 1 metre of the proposed siting\u003cbr\u003e\nAll installation work carries a warranty period of 7 days (warranty period could differ in exceptional circumstances)\u003cbr\u003e\nIncludes labour to install, commission and test for up to 1.5 hours\u003cbr\u003e\nServices must be easily accessible. The installation does not include cutting through any work surfaces\/walls to run services through\u003cbr\u003e\nPlease check the site has the correct requirements for this installation (e.g. suitable power connections). If unsure, a site survey is recommended prior to installation - please call for further information\u003cbr\u003e\nYou can check the Specification tab for more details.\u003c\/p\u003e","brand":"Non Branded","offers":[{"title":"Default Title","offer_id":56803747824003,"sku":"X709","price":297.56,"currency_code":"GBP","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0570\/9375\/0941\/files\/x700_logoicon_c41ea2f8-0901-48c6-92af-95cf2432c874.jpg?v=1762544107"},{"product_id":"x710","title":"Hardwired Wall Mounted Salamander Grill Installation","description":"\u003cp\u003eInstallation, commissioning and testing of a hardwired salamander grill.\u003cbr\u003e\nProfessional installation by a qualified service provider for a commercial wall mounted hardwired salamander grill. Installation includes siting of the product and wiring to existing services, as well as testing once installed. All work is guaranteed for 7 days following the installation.\u003cbr\u003e\nStandard approved isolator switch, junction box or commando socket protected by a suitably rated circuit breaker (dictated by kW rating in appliance specifications) will be required above the counter surface and within 1 metre of the proposed siting\u003cbr\u003e\nAll installation work carries a warranty period of 7 days (warranty period could differ in exceptional circumstances)\u003cbr\u003e\nIncludes labour to install, commission and test for up to 1.5 hours\u003cbr\u003e\nServices must be easily accessible. The installation does not include cutting through any work surfaces\/walls to run services through\u003cbr\u003e\nPlease check the site has the correct requirements for this installation (e.g. suitable power connections). If unsure, a site survey is recommended prior to installation - please call for further information\u003cbr\u003e\nYou can check the Specification tab for more details.\u003c\/p\u003e","brand":"Non Branded","offers":[{"title":"Default Title","offer_id":56803747856771,"sku":"X710","price":297.56,"currency_code":"GBP","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0570\/9375\/0941\/files\/x700_logoicon_e25607cf-eb57-497c-bc03-10efa2f5feeb.jpg?v=1762544109"},{"product_id":"x711","title":"Hardwired Toaster Installation","description":"\u003cp\u003eInstallation, commissioning and testing of a hardwired toaster.\u003cbr\u003e\nProfessional installation by a qualified service provider for a hardwired commercial toaster. Installation includes siting of the product and wiring to existing services, as well as testing once installed. All work is guaranteed for 7 days following the installation.\u003cbr\u003e\nStandard approved isolator switch, junction box or commando socket protected by a suitably rated circuit breaker (dictated by kW rating in appliance specifications) will be required above the counter surface and within 1 metre of the proposed siting\u003cbr\u003e\nAll installation work carries a warranty period of 7 days (warranty period could differ in exceptional circumstances)\u003cbr\u003e\nIncludes labour to install, commission and test for up to 1 hour\u003cbr\u003e\nServices must be easily accessible. The installation does not include cutting through any work surfaces\/walls to run services through\u003cbr\u003e\nPlease check the site has the correct requirements for this installation (e.g. suitable power connections). If unsure, a site survey is recommended prior to installation - please call for further information\u003cbr\u003e\nYou can check the Specification tab for more details.\u003c\/p\u003e","brand":"Non Branded","offers":[{"title":"Default Title","offer_id":56803747922307,"sku":"X711","price":263.77,"currency_code":"GBP","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0570\/9375\/0941\/files\/x700_logoicon_c6b729ec-d9a0-4f93-adc6-732f99621793.jpg?v=1762544112"},{"product_id":"x712","title":"Hardwired Countertop Induction Hob Installation","description":"Installation, commissioning and testing of a hardwired induction hob.\nProfessional installation by a qualified service provider for a commercial countertop hardwired induction hob. Installation includes siting of the product and wiring to existing services, as well as testing once installed. All work is guaranteed for 7 days following the installation.\u003cbr\u003e\u003cbr\u003ePlease note: this is for countertop induction hobs only. If you have a freestanding induction hob to install please call.\nStandard approved isolator switch, junction box or commando socket protected by a suitably rated circuit breaker (dictated by kW rating in appliance specifications) will be required above the counter surface and within 1 metre of the proposed siting\nAll installation work carries a warranty period of 7 days (warranty period could differ in exceptional circumstances)\nIncludes labour to install, commission and test for up to 1 hour\nServices must be easily accessible. The installation does not include cutting through any work surfaces\/walls to run services through\nPlease check the site has the correct requirements for this installation (e.g. suitable power connections). If unsure, a site survey is recommended prior to installation - please call for further information\nYou can check the Specification tab for more details.","brand":"Non Branded","offers":[{"title":"Default Title","offer_id":56803747987843,"sku":"X712","price":263.77,"currency_code":"GBP","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0570\/9375\/0941\/files\/x700_logoicon_566bdbda-55ea-4606-84e9-602e7858f77b.jpg?v=1762544114"},{"product_id":"x713","title":"Hardwired Food Preparation Machine Installation","description":"\u003cp\u003eInstallation, commissioning and testing of a hardwired food prep machine.\u003cbr\u003e\nProfessional installation by a qualified service provider for a commercial hardwired food preparation machine. Installation includes siting of the product and wiring to existing services, as well as testing once installed. All work is guaranteed for 7 days following the installation.\u003cbr\u003e\nStandard approved isolator switch, junction box or commando socket protected by a suitably rated circuit breaker (dictated by kW rating in appliance specifications) will be required above the counter surface and within 1 metre of the proposed siting\u003cbr\u003e\nAll installation work carries a warranty period of 7 days (warranty period could differ in exceptional circumstances)\u003cbr\u003e\nIncludes labour to install, commission and test for up to 1 hour\u003cbr\u003e\nServices must be easily accessible. The installation does not include cutting through any work surfaces\/walls to run services through\u003cbr\u003e\nPlease check the site has the correct requirements for this installation (e.g. suitable power connections). If unsure, a site survey is recommended prior to installation - please call for further information\u003cbr\u003e\nYou can check the Specification tab for more details.\u003c\/p\u003e","brand":"Non Branded","offers":[{"title":"Default Title","offer_id":56803748020611,"sku":"X713","price":263.77,"currency_code":"GBP","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0570\/9375\/0941\/files\/x700_logoicon_21e80500-ad98-4cd8-90e9-c68464ebf925.jpg?v=1762544116"},{"product_id":"x714","title":"Hardwired Vented Tumble Dryer Installation","description":"\u003cp\u003eInstallation, commissioning and testing of a hardwired vented tumble dryer.\u003cbr\u003e\nProfessional installation by a qualified service provider for a hardwired and vented commercial tumble dryer. Installation includes siting of the product and wiring to existing services, as well as testing once installed. All work is guaranteed for 7 days following the installation.\u003cbr\u003e\nStandard approved isolator switch, junction box or commando socket protected by a suitably rated circuit breaker (dictated by kW rating in appliance specifications) will be required above the counter surface and within 1 metre of the proposed siting\u003cbr\u003e\nAll installation work carries a warranty period of 7 days (warranty period could differ in exceptional circumstances)\u003cbr\u003e\nIncludes labour to install, commission and test for up to 1 hour\u003cbr\u003e\nServices must be easily accessible. The installation does not include cutting through any work surfaces\/walls to run services through\u003cbr\u003e\nPlease check the site has the correct requirements for this installation (e.g. suitable power connections). If unsure, a site survey is recommended prior to installation - please call for further information\u003cbr\u003e\nYou can check the Specification tab for more details.\u003c\/p\u003e","brand":"Non Branded","offers":[{"title":"Default Title","offer_id":56803748086147,"sku":"X714","price":330.26,"currency_code":"GBP","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0570\/9375\/0941\/files\/x700_logoicon_9595b76d-4dc3-4285-b081-73014d5948e6.jpg?v=1762544118"},{"product_id":"x718","title":"Hardwired Electric\/Induction Cooking Range Installation","description":"\u003cp\u003eInstallation, commissioning and testing of a hardwired electric\/induction cooking range.\u003cbr\u003e\nInstallation by a qualified service provider for your new cooking range. Installation includes siting of the product (Assistance required for larger items) and wiring to existing services\u003cbr\u003e\nAn industry approved electrical connection point of sufficient rating, as indicated in the appliance technical info, must be available within 1 metre of the appliance siting.\u003cbr\u003e\nInstallation work carries a warranty period of 7 days unless there are exceptional circumstances.\u003cbr\u003e\nLabour to install, commission and test 1.5 Hour\u003cbr\u003e\nServices must be easily accessible.  The installation does not include cutting through any work surfaces\/walls to run services through\u003cbr\u003e\nCustomers that are unsure that they have the correct requirements for this installation, are advised to have a site survey prior to arranging any installations\u003cbr\u003e\nYou can check the Specification tab for more details.\u003c\/p\u003e","brand":"Non Branded","offers":[{"title":"Default Title","offer_id":56803748118915,"sku":"X718","price":297.56,"currency_code":"GBP","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0570\/9375\/0941\/files\/x700_logoicon_ba2f13ca-af97-49f2-b97e-3ca4979bc934.jpg?v=1762544120"},{"product_id":"x719","title":"Hardwired Single Tank Freestanding Fryer Installation","description":"\u003cp\u003eInstallation, commissioning and testing of a hardwired single tank freestanding fryer.\u003cbr\u003e\nInstallation by a qualified service provider for your new fryer. Installation includes siting of the product (Assistance required for larger items) and wiring to existing services\u003cbr\u003e\n1 single phase or 1 three phase (dictated by fryer voltage in specifications) standard approved isolator switch , junction box or commando socket ( grey\/blue single phase or grey\/red three phase) protected by a suitably rated circuit breaker (dictated by fryer kilowatt rating in fryer specifications) will be required within 1 metre of the proposed fryer siting\u003cbr\u003e\nInstallation work carries a warranty period of 7 days unless there are exceptional circumstances.\u003cbr\u003e\nLabour to install, commission and test 1.5 Hours\u003cbr\u003e\nServices must be easily accessible.  The installation does not include cutting through any work surfaces\/walls to run services through\u003cbr\u003e\nCustomers that are unsure that they have the correct requirements for this installation, are advised to have a site survey prior to arranging any installations\u003cbr\u003e\nYou can check the Specification tab for more details.\u003c\/p\u003e","brand":"Non Branded","offers":[{"title":"Default Title","offer_id":56803748151683,"sku":"X719","price":297.56,"currency_code":"GBP","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0570\/9375\/0941\/files\/x700_logoicon_87276a4c-d595-4ac0-aadb-94eef95ace40.jpg?v=1762544123"},{"product_id":"x720","title":"Hardwired Griddle\/Chargrill Installation","description":"\u003cp\u003eInstallation, commissioning and testing of a griddle or chargrill.\u003cbr\u003e\nInstallation by a qualified service provider for your new Griddle or Chargrill. Installation includes siting of the product (Assistance required for larger items) and wiring to existing services\u003cbr\u003e\n1 single phase or 1 three phase (dictated by griddle\/chargrill voltage in specifications) standard approved isolator switch , junction box or commando socket ( grey\/blue single phase or grey\/red three phase) protected by a suitably rated circuit breaker (dictated by kilowatt rating in griddle\/chargrill specifications) will be required within 1 metre of the proposed appliance siting\u003cbr\u003e\nInstallation work carries a warranty period of 7 days unless there are exceptional circumstances.\u003cbr\u003e\nLabour to install, commission and test 1.5 Hours\u003cbr\u003e\nServices must be easily accessible.  The installation does not include cutting through any work surfaces\/walls to run services through\u003cbr\u003e\nCustomers that are unsure that they have the correct requirements for this installation, are advised to have a site survey prior to arranging any installations\u003cbr\u003e\nYou can check the Specification tab for more details.\u003c\/p\u003e","brand":"Non Branded","offers":[{"title":"Default Title","offer_id":56803748184451,"sku":"X720","price":297.56,"currency_code":"GBP","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0570\/9375\/0941\/files\/x700_logoicon_cf593ed4-43df-40fe-9aa3-ce5adfb137a3.jpg?v=1762544126"},{"product_id":"x721","title":"Hardwired Convection Oven Installation","description":"\u003cp\u003eInstallation, commissioning and testing of a hardwired convection oven.\u003cbr\u003e\nInstallation by a qualified service provider for your new oven. Installation includes siting of the product (Assistance required for larger items) and wiring to existing services\u003cbr\u003e\n1 single phase or 1 three phase (dictated by voltage in oven specifications) standard approved isolator switch , junction box or commando socket ( grey\/blue single phase or grey\/red three phase) protected by a suitably rated circuit breaker (dictated by kilowatt rating in oven specifications) will be required within 1 metre of the proposed appliance siting\u003cbr\u003e\nInstallation work carries a warranty period of 7 days unless there are exceptional circumstances.\u003cbr\u003e\nLabour to install, commission and test 2 Hours\u003cbr\u003e\nServices must be easily accessible.  The installation does not include cutting through any work surfaces\/walls to run services through\u003cbr\u003e\nCustomers that are unsure that they have the correct requirements for this installation, are advised to have a site survey prior to arranging any installations\u003cbr\u003e\nYou can check the Specification tab for more details.\u003c\/p\u003e","brand":"Non Branded","offers":[{"title":"Default Title","offer_id":56803748249987,"sku":"X721","price":330.26,"currency_code":"GBP","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0570\/9375\/0941\/files\/x700_logoicon_9016221d-392a-4f2f-875b-1719a77be6fc.jpg?v=1762544128"},{"product_id":"x722","title":"Hardwired Pizza\/Deck Oven Installation","description":"\u003cp\u003eInstallation, commissioning and testing of a hardwired Pizza or deck oven.\u003cbr\u003e\nInstallation by a qualified service provider for your new oven. Installation includes siting of the product (Assistance required for larger items) and wiring to existing services\u003cbr\u003e\n1 single phase or 1 three phase (dictated by voltage in oven specifications) standard approved isolator switch , junction box or commando socket ( grey\/blue single phase or grey\/red three phase) protected by a suitably rated circuit breaker (dictated by kilowatt rating in oven specifications) will be required within 1 metre of the proposed appliance siting\u003cbr\u003e\nInstallation work carries a warranty period of 7 days unless there are exceptional circumstances.\u003cbr\u003e\nLabour to install, commission and test 2 Hours\u003cbr\u003e\nServices must be easily accessible.  The installation does not include cutting through any work surfaces\/walls to run services through\u003cbr\u003e\nCustomers that are unsure that they have the correct requirements for this installation, are advised to have a site survey prior to arranging any installations\u003cbr\u003e\nYou can check the Specification tab for more details.\u003c\/p\u003e","brand":"Non Branded","offers":[{"title":"Default Title","offer_id":56803748282755,"sku":"X722","price":330.26,"currency_code":"GBP","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0570\/9375\/0941\/files\/x700_logoicon_3e7c9295-35f6-4848-af46-6b52d5d9944c.jpg?v=1762544131"},{"product_id":"x723","title":"Hardwired Bratt Pan installation","description":"\u003cp\u003eInstallation, commissioning and testing of a hardwired bratt pan.\u003cbr\u003e\nInstallation by a qualified service provider for your new Bratt Pan. Installation includes siting of the product (Assistance required for larger items) and wiring to existing services\u003cbr\u003e\n1 single phase or 1 three phase (dictated by voltage in appliance specifications) standard approved isolator switch , junction box or commando socket ( grey\/blue single phase or grey\/red three phase) protected by a suitably rated circuit breaker (dictated by kilowatt rating in appliance specifications) will be required within 1 metre of the proposed appliance siting\u003cbr\u003e\nInstallation work carries a warranty period of 7 days unless there are exceptional circumstances.\u003cbr\u003e\nLabour to install, commission and test 2 Hours\u003cbr\u003e\nServices must be easily accessible.  The installation does not include cutting through any work surfaces\/walls to run services through\u003cbr\u003e\nCustomers that are unsure that they have the correct requirements for this installation, are advised to have a site survey prior to arranging any installations\u003cbr\u003e\nYou can check the Specification tab for more details.\u003c\/p\u003e","brand":"Non Branded","offers":[{"title":"Default Title","offer_id":56803748315523,"sku":"X723","price":330.26,"currency_code":"GBP","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0570\/9375\/0941\/files\/x700_logoicon_ba029212-4e24-439d-9c0c-a2f2e5fa80af.jpg?v=1762544133"},{"product_id":"x724","title":"Hardwired Pasta Cooker (Manual Fill) Installation","description":"\u003cp\u003eInstallation, commissioning and testing of a hardwired  manual fill pasta cooker.\u003cbr\u003e\nInstallation by a qualified service provider for your new Bratt Pan. Installation includes siting of the product (Assistance required for larger items) and wiring to existing services\u003cbr\u003e\n1 single phase or 1 three phase (dictated by appliance voltage in specifications) standard approved isolator switch , junction box or commando socket ( grey\/blue single phase or grey\/red three phase) protected by a suitably rated circuit breaker (dictated by appliance kilowatt rating in appliance specifications) will be required within 1 metre of the proposed appliance siting\u003cbr\u003e\nInstallation work carries a warranty period of 7 days unless there are exceptional circumstances.\u003cbr\u003e\nLabour to install, commission and test 1 Hour\u003cbr\u003e\nServices must be easily accessible.  The installation does not include cutting through any work surfaces\/walls to run services through\u003cbr\u003e\nCustomers that are unsure that they have the correct requirements for this installation, are advised to have a site survey prior to arranging any installations\u003cbr\u003e\nYou can check the Specification tab for more details.\u003c\/p\u003e","brand":"Non Branded","offers":[{"title":"Default Title","offer_id":56803748348291,"sku":"X724","price":263.77,"currency_code":"GBP","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0570\/9375\/0941\/files\/x700_logoicon_d8d88d08-e988-44d8-9879-f60b5a5f6729.jpg?v=1762544135"},{"product_id":"x725","title":"Hardwired Pasta Cooker (Auto Fill) Installation","description":"Installation, commissioning and testing of a hardwired.\nInstallation by a qualified service provider for your new Pasta Cooker. Installation includes siting of the product (Assistance required for larger items) and wiring to existing services\n1 single phase or 1 three phase (dictated by appliance voltage in specifications) standard approved isolator switch , junction box or commando socket ( grey\/blue single phase or grey\/red three phase) protected by a suitably rated circuit breaker (dictated by appliance kilowatt rating in appliance specifications) along with a water supply terminated with a washing machine type ¾\" isolator valve will be required within 1 metre of the proposed appliance siting\nInstallation work carries a warranty period of 7 days unless there are exceptional circumstances.\nLabour to install, commission and test 1.5 Hours\nServices must be easily accessible.  The installation does not include cutting through any work surfaces\/walls to run services through\nCustomers that are unsure that they have the correct requirements for this installation, are advised to have a site survey prior to arranging any installations\nYou can check the Specification tab for more details.","brand":"Non Branded","offers":[{"title":"Default Title","offer_id":56803748381059,"sku":"X725","price":297.56,"currency_code":"GBP","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0570\/9375\/0941\/files\/x700_logoicon_a66fa7b1-fde4-40ce-b0ff-af1f919e81f5.jpg?v=1762544137"},{"product_id":"x726","title":"Hardwired Conveyor Oven Installation","description":"\u003cp\u003eInstallation, commissioning and testing of a hardwired.\u003cbr\u003e\nInstallation by a qualified service provider for your new Conveyor Oven. Installation includes siting of the product (Assistance required for larger items) and wiring to existing services\u003cbr\u003e\n1 single phase or 1 three phase (dictated by voltage in oven specifications) standard approved isolator switch , junction box or commando socket ( grey\/blue single phase or grey\/red three phase) protected by a suitably rated circuit breaker (dictated by kilowatt rating in oven specifications) will be required within 1 metre of the proposed appliance siting\u003cbr\u003e\nInstallation work carries a warranty period of 7 days unless there are exceptional circumstances.\u003cbr\u003e\nLabour to install, commission and test 2 Hours\u003cbr\u003e\nServices must be easily accessible.  The installation does not include cutting through any work surfaces\/walls to run services through\u003cbr\u003e\nCustomers that are unsure that they have the correct requirements for this installation, are advised to have a site survey prior to arranging any installations\u003cbr\u003e\nYou can check the Specification tab for more details.\u003c\/p\u003e","brand":"Non Branded","offers":[{"title":"Default Title","offer_id":56803748413827,"sku":"X726","price":330.26,"currency_code":"GBP","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0570\/9375\/0941\/files\/x700_logoicon_47251236-7753-48a9-9d15-ec0d49f51017.jpg?v=1762544154"},{"product_id":"x727","title":"Potato Peeler\/Rumbler Installation","description":"Installation, commissioning and testing of a hardwired.\nInstallation by a qualified service provider for your new Potato Peeler or Rumbler. Installation includes siting of the product (Assistance required for larger items) and wiring to existing services\nA single phase industry approved isolator switch, junction box or commando socket(grey\/blue) protected by a suitably rated circuit breaker(dictated by kilowatt rating in appliance specifications) along with a water supply terminated with a ¾\"bsp washing machine type isolator valve will be required within 1 metre of the proposed appliance siting. There are various drain options from draining into a sink or bucket to solid piped into the service drain available dependant upon manufacturer and model.\nInstallation work carries a warranty period of 7 days unless there are exceptional circumstances.\nLabour to install, commission and test 2 Hours\nServices must be easily accessible.  The installation does not include cutting through any work surfaces\/walls to run services through\nCustomers that are unsure that they have the correct requirements for this installation, are advised to have a site survey prior to arranging any installations\nYou can check the Specification tab for more details.","brand":"Non Branded","offers":[{"title":"Default Title","offer_id":56803748446595,"sku":"X727","price":330.26,"currency_code":"GBP","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0570\/9375\/0941\/files\/x700_logoicon_dcfead4a-dcbe-4cb0-8e63-84102d1d09d3.jpg?v=1762544159"},{"product_id":"x728","title":"Hardwired Blast Chiller Installation","description":"\u003cp\u003eInstallation, commissioning and testing of a hardwired.\u003cbr\u003e\nInstallation by a qualified service provider for your new Blast Chiller. Installation includes siting of the product (Assistance required for larger items) and wiring to existing services\u003cbr\u003e\nA single phase industry approved isolator switch, junction box or commando socket(blue\/grey) protected by a suitably rated circuit breaker(dictated by kilowatt rating in appliance specifications) will be required within a metre of the proposed appliance siting.\u003cbr\u003e\nInstallation work carries a warranty period of 7 days unless there are exceptional circumstances.\u003cbr\u003e\nLabour to install, commission and test 2 Hours\u003cbr\u003e\nServices must be easily accessible.  The installation does not include cutting through any work surfaces\/walls to run services through\u003cbr\u003e\nCustomers that are unsure that they have the correct requirements for this installation, are advised to have a site survey prior to arranging any installations\u003cbr\u003e\nYou can check the Specification tab for more details.\u003c\/p\u003e","brand":"Non Branded","offers":[{"title":"Default Title","offer_id":56803748479363,"sku":"X728","price":330.26,"currency_code":"GBP","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0570\/9375\/0941\/files\/x700_logoicon_8c805d5b-8ca5-45df-a250-ce1bbcdeeb9c.jpg?v=1762544161"},{"product_id":"x729","title":"Hardwired Twin Tank Freestanding Fryer Installation","description":"\u003cp\u003eInstallation, commissioning and testing of a hardwired.\u003cbr\u003e\nInstallation by a qualified service provider for your new Fryer. Installation includes siting of the product (Assistance required for larger items) and wiring to existing services\u003cbr\u003e\n2 single phase or 2 three phase (dictated by fryer voltage in specifications) standard approved isolator switches , junction boxes or commando sockets ( grey\/blue single phase or grey\/red three phase) protected by suitably rated circuit breakers (dictated by fryer kilowatt rating in fryer specifications) will be required within 1 metre of the proposed fryer siting\u003cbr\u003e\nInstallation work carries a warranty period of 7 days unless there are exceptional circumstances.\u003cbr\u003e\nLabour to install, commission and test 2 Hours\u003cbr\u003e\nServices must be easily accessible.  The installation does not include cutting through any work surfaces\/walls to run services through\u003cbr\u003e\nCustomers that are unsure that they have the correct requirements for this installation, are advised to have a site survey prior to arranging any installations\u003cbr\u003e\nYou can check the Specification tab for more details.\u003c\/p\u003e","brand":"Non Branded","offers":[{"title":"Default Title","offer_id":56803748512131,"sku":"X729","price":330.26,"currency_code":"GBP","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0570\/9375\/0941\/files\/x700_logoicon_68d403d7-926b-4291-bb8e-4a2947842e85.jpg?v=1762544163"},{"product_id":"x730","title":"Site Survey for Installation (install sold seperately)","description":"\u003cp\u003eA site survey for complex products (e.g. gas appliances or combi ovens) to ensure a succesful first time installation..\u003cbr\u003e\nSite visit by a qualified service provider to assess the facilities and connections available on site. (e.g. power\/gas supply, extraction system and drainage) This service is in place to avoid a costly failed installation should we be unable to install your appliance.\u003cbr\u003e\nUpon purchase of a site survey you will be contacted by a member of our install team to quote for the full installation price. An engineer will also contact you to discuss your requirements and confirm availibility.\u003cbr\u003e\nIf additional work is required ahead of installation your engineer will advise on what work is needed and postpone the final installation until all services are in place.\u003cbr\u003e\nPlease give more than 24hrs notice if you wish to cancel or re-arrange your visit, we are unable to provide a refund if cancelled with less than 24hrs notice.\u003cbr\u003e\nIf you have any questions please contact our installation team on 0117 3459 539 or email info@technical-sales.co.uk\u003cbr\u003e\nYou can check the Specification tab for more details.\u003c\/p\u003e","brand":"Non Branded","offers":[{"title":"Default Title","offer_id":56803748544899,"sku":"X730","price":182.02,"currency_code":"GBP","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0570\/9375\/0941\/files\/x730_instalation_b8620ed3-5531-451f-a2af-901b344cd651.jpg?v=1762544165"},{"product_id":"x741","title":"Economy Undercounter Warewashing Machine Installation","description":"\u003cp\u003eInstallation, commissioning and testing of an undercounter warewashing machine.\u003cbr\u003e\nSite Survey and Installation by a qualified service provider for your new dishwasher\/glasswasher. Installation includes connection to existing services, commissioning and testing.\u003cbr\u003e\nAn industry approved electrical connection point, water supply and drainage of sufficient specification, as indicated in the appliance technical info, must be available within 1 metre of the appliance siting\u003cbr\u003e\nLabour to install, commission and test 2 hours\u003cbr\u003e\nServices must be easily accessible.  The installation does not include cutting through any work surfaces\/walls to run services through\u003cbr\u003e\nInstallation work carries a warranty period of 7 days unless there are exceptional circumstances\u003cbr\u003e\nYou can check the Specification tab for more details.\u003c\/p\u003e","brand":"Non Branded","offers":[{"title":"Default Title","offer_id":56803748577667,"sku":"X741","price":396.75,"currency_code":"GBP","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0570\/9375\/0941\/files\/x700_logoicon_a37c2ac7-67f4-4349-a16a-ca893d6bf9ac.jpg?v=1762544167"},{"product_id":"x742","title":"Premium Undercounter Warewashing Machine Installation","description":"\u003cp\u003eInstallation, commissioning and testing of a premium undercounter warewashing machine.\u003cbr\u003e\nInstallation by a qualified service provider for your new dishwasher\/glasswasher. Installation includes connection to existing services, commissioning and testing.\u003cbr\u003e\nAn industry approved electrical connection point, water supply and drainage of sufficient specification, as indicated in the appliance technical info, must be available within 1 metre of the appliance siting\u003cbr\u003e\nLabour to install, commission and test 2-3 hours\u003cbr\u003e\nServices must be easily accessible.  The installation does not include cutting through any work surfaces\/walls to run services through\u003cbr\u003e\nInstallation work carries a warranty period of 7 days unless there are exceptional circumstances\u003cbr\u003e\nYou can check the Specification tab for more details.\u003c\/p\u003e","brand":"Non Branded","offers":[{"title":"Default Title","offer_id":56803748643203,"sku":"X742","price":473.05,"currency_code":"GBP","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0570\/9375\/0941\/files\/x700_logoicon_87f1e570-d111-4dc4-a9ff-baebaee3de9d.jpg?v=1762544169"},{"product_id":"x743","title":"Pass Through Dishwasher Site Survey and Installation","description":"\u003cp\u003eSite survey, installation, commissioning and testing of a pass through warewashing machine.\u003cbr\u003e\nInstallation by a qualified service provider for your new dishwasher. Installation includes connection to existing services, commissioning and testing.\u003cbr\u003e\nAn industry approved electrical connection point, water supply and drainage of sufficient specification, as indicated in the appliance technical info, must be available within 1 metre of the appliance siting\u003cbr\u003e\nLabour to install, commission and test 3-4 hours\u003cbr\u003e\nServices must be easily accessible.  The installation does not include cutting through any work surfaces\/walls to run services through\u003cbr\u003e\nInstallation work carries a warranty period of 7 days unless there are exceptional circumstances\u003cbr\u003e\nYou can check the Specification tab for more details.\u003c\/p\u003e","brand":"Non Branded","offers":[{"title":"Default Title","offer_id":56803748675971,"sku":"X743","price":748.82,"currency_code":"GBP","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0570\/9375\/0941\/files\/x700_logoicon_494bce36-3629-46e7-ae2d-9854d766ea1d.jpg?v=1762544171"},{"product_id":"x745","title":"Gas Safety Certificate (1-5 Appliances)","description":"\u003cp\u003eAnnual Gas Safety Certification of up to 5 appliances.\u003cbr\u003e\nThis annual visit will include ensuring your kitchen has the relevant safety devices, suitable extraction and ventilation to accommodate the by-product of combustion created by gas equipment. We will check for tampering or misuse, assess the gas pressure into the kitchen and perform a health check on your appliances to ensure these are also safe.\u003cbr\u003e\nYour engineer will liase with you to arrange a suitable time to attend. They will need to access behind your appliances and will switch off the gas supply for around 10 minutes\u003cbr\u003e\nLabour to complete checks 1-2 hours\u003cbr\u003e\nThe cost of your safety certificate is included\u003cbr\u003e\nYou can check the Specification tab for more details.\u003c\/p\u003e","brand":"Non Branded","offers":[{"title":"Default Title","offer_id":56803748708739,"sku":"X745","price":220.17,"currency_code":"GBP","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0570\/9375\/0941\/files\/x745_1.jpg?v=1762544173"},{"product_id":"x746","title":"Gas Safety Certificate (5-10 Appliances)","description":"\u003cp\u003eAnnual Gas Safety Certification of up to 10 appliances.\u003cbr\u003e\nThis annual visit will include ensuring your kitchen has the relevant safety devices, suitable extraction and ventilation to accommodate the by-product of combustion created by gas equipment. We will check for tampering or misuse, assess the gas pressure into the kitchen and perform a health check on your appliances to ensure these are also safe.\u003cbr\u003e\nYour engineer will liase with you to arrange a suitable time to attend. They will need to access behind your appliances and will switch off the gas supply for around 10 minutes\u003cbr\u003e\nLabour to complete checks 2 hours\u003cbr\u003e\nThe cost of your safety certificate is included\u003cbr\u003e\nYou can check the Specification tab for more details.\u003c\/p\u003e","brand":"Non Branded","offers":[{"title":"Default Title","offer_id":56803748741507,"sku":"X746","price":274.67,"currency_code":"GBP","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0570\/9375\/0941\/files\/x746_1.jpg?v=1762544176"},{"product_id":"x758","title":"Hardwired Triple Tank Freestanding Fryer Installation","description":"\u003cp\u003eInstallation, commisioning and testing of a hardwired triple tank fryer.\u003cbr\u003e\nInstallation by a qualified service provider for your new fryer. Installation includes connection to existing services.\u003cbr\u003e\nAn industry approved power connection point of sufficient specification, as indicated in the appliance technical info, must be available within 1 metre of the appliance siting.\u003cbr\u003e\nLabour to install, commission and test on one visit.\u003cbr\u003e\nServices must be easily accessible.  The installation does not include cutting through any work surfaces\/walls to run services through\u003cbr\u003e\nCustomers are advised to have a site survey prior to arranging any gas installations to ensure they have the correct requirements for this installation.\u003cbr\u003e\nInstallation work carries a warranty period of 7 days unless there are exceptional circumstances.\u003cbr\u003e\nYou can check the Specification tab for more details.\u003c\/p\u003e","brand":"Non Branded","offers":[{"title":"Default Title","offer_id":56803748774275,"sku":"X758","price":308.46,"currency_code":"GBP","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0570\/9375\/0941\/files\/x700_logoicon_603350e3-91ac-4f51-8b04-87120af7aa5a.jpg?v=1762544177"}],"url":"https:\/\/canmac.co.uk\/collections\/installations.oembed","provider":"Canmac Catering Equipment","version":"1.0","type":"link"}